Served from
Wise Glass, Hurst service area
Hurst, TX 76054 service area(682) 688-8815HoursMon–Fri 8 am–5 pmSat–Sun closed
Wise Glass installs glass shower doors and enclosures in Arlington, TX. One in-house team handles your project from first measurement to final install. No subcontractors, no handoffs outside our company. Send photos and rough dimensions for a quote within 24 hours. Larger or more complex projects get an in-person measurement.
Send the Arlington address, current bathroom photos and the planned changes. Tell us whether the tub is staying, which fixtures will move and any entry concerns you want addressed. We can discuss the enclosure around those details, then identify what is needed for a clear quote and final measurements after the defining surfaces are ready.
Having trouble with the form? Open the secure form in a new tab or call (682) 688-8815.

A shower door replacement often starts with an older framed door and the metal track under it. Once those come out of your Arlington bathroom, the opening left behind decides the next step. Sound tile and a curb that slopes toward the drain can take new frameless glass. Cracked grout, loose tile or a soft base needs a tile contractor before any glass is measured.
Take one photo straight on and one from the side so the curb, wall edges and any old screw holes show. If the tub is coming out instead, hold the glass decision until the new base and walls are planned.
Every Arlington shower door and glass enclosure follows the same four steps. Send photos and rough dimensions for a quote within 24 hours. Larger or more complex projects get an in-person measurement. Before the final measurement, every surface the glass touches (tile, curb, walls and floor) must be complete: tile set, grouted, caulked and fully cured, with waterproofing done.
Your custom glass is typically installed within 7 to 10 days after the final measurement. Wait 24 hours before the first shower so the silicone can cure, and do not touch the silicone seals while they cure.
A sliding glass shower door makes sense where the shower sits beside a vanity or toilet and a swinging door has nowhere to land. The panels overlap, so the entry is narrower than the full opening. A hinged door gives a wider entry but needs floor space outside the shower. Ask to see the clear entry width for both layouts on the drawing.
On installation day the glass, hardware and seals go in and the joints are sealed with silicone. Every new shower installation comes with a bottle of Wise Care glass cleaner, left in your shower by the crew.
If a bathtub is coming out, the new shower base and entrance need to be planned before the glass enclosure is drawn. Decide where the controls will sit and how you will reach them. A low or curbless entry is a wider bathroom-design question that involves drainage and surrounding construction, not just the height of the door.
Ask the contractor and glass team to work from the same room layout. Mark any bench, fixed panel and nearby vanity on the drawing. A frameless shower enclosure is measured from the completed surfaces, while the early design conversation helps identify conflicts before construction locks them in. Keep those two stages distinct in the schedule.
A larger shower project can make the old mirror feel out of step with the rest of the room. Before replacing it, check whether the issue is size, placement or lighting. A custom mirror can be shaped by the vanity and the available wall area without automatically extending across every surface.
Try an outline at the proposed size and check the reflection from the usual positions. Tell the team if lights, outlets or a backsplash are being moved. Those locations can affect the final dimensions and mounting. Keep each mirror listed separately from the enclosure so you can review its specification and timing without confusing the two orders.
Arlington is in Tarrant County, between Fort Worth and Grand Prairie, and Wise Glass serves it from our Hurst service area. Arlington's official home-project guide distinguishes cosmetic changes from larger work and specifically discusses bathroom remodels. That makes the city's Planning and Development resources a useful place to start when a project changes the room beyond its glass. Confirm the requirements for your actual scope with the city and the professionals coordinating the job. For the enclosure, focus on the finished base, doorway and adjacent fixtures. A conversion should have those decisions settled together so the new glass does not arrive before the surfaces and clearances it depends on have been established in the bathroom.
Served from
HoursMon–Fri 8 am–5 pmSat–Sun closed
Explore steam enclosures, mirrors and railings alongside your shower plans.
Browse the full glass gallery ↗This inquiry is for the custom glass scope. The shower base, waterproofing, plumbing and other construction need their own defined responsibilities with the appropriate project professionals. Share the broader plan so the enclosure can be coordinated with it. Ask for the proposal to make the included glass work and any separate preparation clear before proceeding.
The city's Planning and Development resources and home-project guide are the starting point. Describe the full work and property address, including changes to the base, walls or plumbing. Ask about the actual scope rather than relying on a generic project label. Keep that review coordinated with the contractor while the glass layout is being developed.
Every enclosure is custom priced. The layout matters most: each angle and miter adds fabrication cost. Glass thickness, glass type and hardware finish also affect the price. Send photos and rough dimensions for a quote within 24 hours. Larger or more complex projects get an in-person measurement.
Your custom glass is typically installed within 7 to 10 days after the final measurement. Wait 24 hours before the first shower so the silicone can cure, and do not touch the silicone seals while they cure.
Tell us about the room, the glass you have in mind and when the surrounding work will be ready.